Jewellery Industry
- Home
- Jewellery Industry
Jewelry & Lab-Grown (CVD) Manufacturing on Microsoft Power Platform
Digitize your production from CAD Design to QC & Packaging. Gain real-time visibility, reduce variance, and deliver on time—consistently.
The Problem: Great Craftsmanship, Disconnected Systems
Spreadsheets, WhatsApp approvals, and paper logs cause delays, rework, and metal/stone wastage. Managers lack live production visibility across departments and locations.
- No live visibility across Design → Casting → QC
- Metal & stone variance hard to reconcile
- Version & approval chaos in chats and files
- Inconsistent QC and limited batch traceability
What You’ll Eliminate
Version confusion, manual handovers, blind spots between departments.
What You’ll Gain
- Live job status by design code, batch, and artisan
- Secure, centralized data with full audit trail
- Power BI dashboards for owners & supervisors
One Platform • End-to-End Control
Automate approvals, standardize SOPs, and see the whole factory in real time.
Core Modules
- Design Management — CAD uploads, versions, client approvals
- Mold & Wax Tracking — mold IDs, repairs, wax trees
- Casting Control — metal input/output, batch linkage, variance
- Assembly & Stone Setting — assignments, timestamps, photos
- Polish & Plating — steps, defects, finishes
- Quality Control — checklists, photo verification, hallmarks
- Reports & Dashboards — WIP, throughput, delays
Why Microsoft Power Platform
- Security — Azure/Dataverse, RBAC, compliance
- Native 365 — Teams, SharePoint, Outlook, Power BI
- Low-code agility — evolve fast, avoid tech debt
- Scalable — single workshop to multi-factory
Lab-Grown Diamond (CVD) Add-On
Purpose-built extensions for CVD plants—batch/run traceability, seed mapping, and scientific QC capture, fully Microsoft-native.
Traceability & Inventory
- CVD Run Logs — reactor ID, recipe parameters, start/stop, gas flow/pressure, alarms
- Seed/Wafer Inventory — assign seeds to runs; map boules → stone serials
- Post-Growth — HPHT/anneal steps with approvals
- Integration-ready — Dataverse/SharePoint now; ERP/LIMS connector stub
Quality & Analytics
- QC Capture — PL/Raman/UV images & readings, 4C fields, IGI/GIA references
- Non-Conformance & CAPA — workflows with Teams alerts
- Dashboards — yield by run, FPY by cut stage, OEE & downtime
- Governance — error handling, audit logs, role-based access
See It in Action
60-second overview of the platform.
What Clients Say
FAQs
Do we need Microsoft licenses?
If you already use M365, we extend your stack. Otherwise we can host/manage and later advise the best-value licensing path.
How long to go live?
Start with a focused pilot (e.g., Design & Casting or CVD run logs) in 2–4 weeks; expand in phases.
What about support & training?
Admin/user training, SOPs, and ongoing support are included.
Can you integrate with finance/inventory?
Yes — optional Business Central/ERP integration for costing and inventory.
Book a Call
Get a walkthrough tailored to your process and roles.